What typing it twice really costs: a worked example

Twenty-five minutes a day sounds like nothing. For a team of four it's 420 hours and $13,440 a year, before counting a single mistake. A worked example you can redo with your own numbers, including when not to build.

An old punch time clock on a wall covered in notes and business cards. Headline: Nobody clocks in for retyping. 420 hours a year, at about $13,440.

Ask a small team how long they spend copying data between systems and the answer is almost always “not that long, maybe twenty minutes a day.” It sounds like nothing. Then you multiply it out, and twenty minutes a day turns into a part-time job that nobody was hired to do.

This is a worked example you can redo with your own numbers. No industry statistics, no vendor claims: just arithmetic on the time your team already spends.

The setup

Picture a typical small business: orders come in through the website, get typed into the accounting system, and the customer details get copied into the CRM so sales can follow up. Four people touch this every day.

4people who re-enter data
25 mineach, per working day
$32an hour, with payroll costs

The $32 is a loaded rate: wages plus payroll taxes and benefits, which is what an hour of someone’s time actually costs the business. Use your own figure; it’s usually higher than people expect.

The arithmetic

Step Calculation Result
Minutes a day 4 people × 25 minutes 100 min
Hours a month 100 min × 21 working days ÷ 60 35 h
Hours a year 35 h × 12 420 h
Cost a year 420 h × $32 $13,440

420 hours is about ten and a half working weeks. Every year, a quarter of a full-time person goes into retyping information that already exists somewhere else.

Twenty-five minutes a day doesn’t feel like a cost. Ten weeks a year does.

What the hours don’t include

The $13,440 is only the time spent typing. The costs that usually matter more don’t show up in that number:

  • Fixing mistakes. Every manual copy is a chance for a transposed digit or a missed line. Finding and fixing those takes longer than the original entry, and some are found by customers first.
  • Slower cash. If invoices go out when someone gets round to typing them, you get paid later. That’s a cash-flow cost even when nobody is idle.
  • Decisions on stale numbers. Reports built from copies are only as current as the last time someone copied. Teams quietly stop trusting them.
  • Key-person risk. When the one person who knows the routine is out, the work stops or gets done wrong.

These are real but hard to put a number on, so this example leaves them out. That makes everything below conservative.

Be honest about what automation removes

An integration rarely removes 100% of the manual work. Exceptions still need a person: an order with a typo in the address, a customer who should be merged, a refund that needs a judgement call. So compare realistic scenarios, not a fantasy.

Bar chart: today 420 hours and $13,440 a year; if an integration removes 60% of the work, 168 hours and $5,376; if it removes 90%, 42 hours and $1,344. Payback on a $5,000 integration is about 7.4 months at 60% and about 5 months at 90%.
The same team, before and after. Even the cautious scenario pays back within the year.
Scenario Hours left a year Saved a year Payback on $5,000
Removes 60% of the work 168 h $8,064 ~7.4 months
Removes 90% of the work 42 h $12,096 ~5 months

Payback is the build cost divided by the monthly saving: $5,000 ÷ ($8,064 ÷ 12) is about 7.4 months. Add ongoing costs, like a support plan or app subscription, to the build cost before you divide.

Run your own numbers

The calculator on our homepage does the first half of this in your browser. Move the sliders to match your team and it shows the hours and yearly cost. Nothing is sent anywhere.

When it doesn’t add up

Sometimes the honest answer is “don’t build it.” If one person spends ten minutes a day, that’s about 42 hours a year: around $1,300 at the same rate. A custom integration won’t pay back. A cheap off-the-shelf app might, or a better checklist might be enough.

The point of doing the arithmetic is to make the decision on numbers rather than frustration, in either direction.

How to measure your own baseline

  1. For one normal week, have each person note roughly how long they spend copying information between systems each day.
  2. Note every time a mistake from re-entry had to be fixed, and how long the fix took.
  3. Use a loaded hourly rate, not the wage alone.
  4. Multiply out to a year, then compare against realistic scenarios, not 100% removal.

One week of rough notes beats any industry average, because it’s your team and your systems.

Tell us where the work gets stuck.

Send a few lines about the systems you use and the part that keeps breaking. We read every message and reply within one business day.

Talk to usOr book a call

Based in the Quad Cities. Working with teams here and further away.

Privacy preferences

You make the call.

Browsing and contacting us work with analytics switched off. Your choice applies to this browser for 180 days; you can change it at any time.

Essential functions

Security, form protection, and saving your privacy choice. The motion control also remembers your preference.

Always available

Privacy policy · Cookie details